WORK OVER OPERATION/ WELL SERVICING IN OIL AND GAS WELL



WORK OVER OPERATION/ WELL SERVICING IN OIL AND GAS WELL

                              The following table lists the terms used and defines their meaning:

Upper Completion:                            The part of the completion above the production packer.
Lower Completion:                            The part of the completion below the production packer.
Well Intervention:                              Any well servicing which requires operations in the wellbore.
Workover:                                          Any work performed that requires the killing of the well (with placement of a hydrostatic barrier in the wellbore) and removal of the Xmas tree and tubing strings(s).
Live Well Intervention:                      Any operation in the wellbore through the Xmas tree on a live well (or potentially live well) requiring pressure control equipment.
Snubbing:                                           Live well intervention rig operations using jointed pipe (although the original meaning of the term was for the insertion of pipe into a well under pressure).
Hydraulic Workover Unit (HWO):    Is a specialised hydraulic driven unit designed to conduct either snubbing operations or workover operations (these units with light drilling capability are also sometimes termed light rigs).
Outside Casing Operations:               Any servicing which is below the production casing shoe or through a window cut in the casing
Conventional Coiled Tubing:             Coil Tubing for conventional CT operations.
Large Bore Coiled Tubing:                Coil Tubing for heavy-duty operations such as CT drilling which requires a deployment system such as a tower.
Light Drilling Rig:                             A portable rig with pulling and rotating capability sufficient to conduct drilling operations outside the casing and pulling tubing, i.e. workover rig, HWO unit, etc.
Drilling Rig:                                       Conventional drilling unit.
Workover Rig:                                   Another term for a light drilling unit.
Hoist:                                                 A portable unit which has pulling capabilities but has no, or very limited, rotating capability.

Friday, 26 August 2016

WELL SERVICING METHOD APPLICATIONS



WELL SERVICING METHOD APPLICATIONS

Slickline, or ‘Mechanical Wireline’ as it is often termed, is the most common well servicing method. It is by far the lowest cost well intervention method but like electric line is limited to wells with deviations less than 70o unless roller bogies or tractors (which are currently under development) are used.
Slickline is used extensively as it is usually readily available, self-contained and easily located on any well site either on land or offshore. The wireline unit can use either a slickline or braided line or cable (sometimes termed swab line) to conduct operations. Slickline is used for all normal operations and braided line is used for heavy duty operations such as running 7” wireline retrievable sub-surface safety valves and fishing.
Wireline units are available in single drum or double drum configurations. The single drum unit usually only deploys slickline and the double drum unit has a drum of slickline and a drum of braided line. Slickline is available in 0.147”, 0.125”, 0.108”, 0.092” and 0.082” diameter sizes and cable in 3/16” or 7/32” diameter. 0.133” diameter slickline is also currently under development.
Slickline operations in well angles greater than 70o can be carried out using coiled tubing with modified slickline tooling. Similar to stiff wireline described in the previous section, the use of coil can have advantages with regard to pulling capacity (useful for fishing) and when needing to clear off debris to enable latching with downhole devices.
The advancement in electronics now gives a wider role for mechanical wireline in logging operations by using memory logging toolstrings. These record the data which is recovered when the tools are retrieved back to surface. This method is considerably cheaper than real time logging with electric line.
Electronics are now also used in some wireline retrievable bridge plug systems where the plug is set and sometimes retrieved with electric motor driven setting and retrieving tools.
Perforating can also now be carried out using slickline since Safe firing systems have been developed. These operate downhole only when a series of pre-set triggers, (time, pressure, temperature, motion) which are dependent on well conditions, are activated, leading to detonation of the firing head.

The following table lists the well services provided by mechanical wireline method:
·         Tubing gauging to check for collapsed tubing or tubing blockages.
·         Wireline downhole safety valve installation and retrieval for scheduled maintenance or failure.
·         Well plugging with conventional nipple systems or bridge plugs to enable leak detection or for providing barriers for Xmas tree removal or repair or abandonment of lower depleted zones.
·         Gas lift valve installation into SPMs to initiate gas lifting or replacement of valve for scheduled maintenance or for failure.
·         Control production from individual zones by opening or closing sliding side doors (SSDs) or similar devices.
·         Swabbing to remove hydrostatic overbalance and induce natural flow or to remove spent fluid after stimulation to prevent formation damage.
·         Leak detection by the use of plugs at various depths or running a temperature instrument.
·         Scale/paraffin/wax removal with gauge cutters to reinstate optimum production rates.
·         Sand/debris removal by bailing to obtain optimum production or enable wireline access below bridge off depth.
·         Re-perforating (with specially adapted firing systems) to bypass damaged perforations.
·         Casing and tubing repairing with straddles to maintain well integrity.
·         Tubing punching to bring on production from additional zones or to enable circulation via the annulus for well killing.
·         Conventional pressure and temperature surveys with conventional BHP gauges to obtain reservoir and flowing data.
·         Memory tool production logging (PLT) to obtain reservoir interval data.
·         Casing and tubing corrosion monitoring with callipers to ensure tubular integrity.
·         Fishing to clear conduits of lost or stuck tools/debris.

Sunday, 21 August 2016

WORK OVER OPERATION/ WELL SERVICING IN OIL AND GAS WELL



WORK OVER OPERATION/ WELL SERVICING IN OIL AND GAS WELL

                              The following table lists the terms used and defines their meaning:

Upper Completion:                            The part of the completion above the production packer.
Lower Completion:                            The part of the completion below the production packer.
Well Intervention:                              Any well servicing which requires operations in the wellbore.
Workover:                                          Any work performed that requires the killing of the well (with placement of a hydrostatic barrier in the wellbore) and removal of the Xmas tree and tubing strings(s).
Live Well Intervention:                      Any operation in the wellbore through the Xmas tree on a live well (or potentially live well) requiring pressure control equipment.
Snubbing:                                           Live well intervention rig operations using jointed pipe (although the original meaning of the term was for the insertion of pipe into a well under pressure).
Hydraulic Workover Unit (HWO):    Is a specialised hydraulic driven unit designed to conduct either snubbing operations or workover operations (these units with light drilling capability are also sometimes termed light rigs).
Outside Casing Operations:               Any servicing which is below the production casing shoe or through a window cut in the casing
Conventional Coiled Tubing:             Coil Tubing for conventional CT operations.
Large Bore Coiled Tubing:                Coil Tubing for heavy-duty operations such as CT drilling which requires a deployment system such as a tower.
Light Drilling Rig:                             A portable rig with pulling and rotating capability sufficient to conduct drilling operations outside the casing and pulling tubing, i.e. workover rig, HWO unit, etc.
Drilling Rig:                                       Conventional drilling unit.
Workover Rig:                                   Another term for a light drilling unit.
Hoist:                                                 A portable unit which has pulling capabilities but has no, or very limited, rotating capability.