Friday, 30 September 2016

USEFUL WELL CONTROL FORMULAS IN DRILLING AND WELL SERVICING OPERATION



USEFUL WELL CONTROL FORMULAS (Drilling)
1.   Pressure Gradient (PG) (Psi/ft) = MW (ppg) x 0.052
2.   Mud Weight (MW) = PG  ÷ 0.052
3.   Hydrostatic Pressure (HP) = TVD x MW (ppg) x 0.052
4.   Equivalent Mud Weight (EMW) (ppg) = Psi ÷ TVD ÷ 0.052
5.   Pipe Capacity (Bbl/ft) = Pipe ID2 ÷ 1029.4
6.   Hole Capacity (Bbl/ft) = Hole Dia2 ÷ 1029.4
7.   Annular Capacity (Bbl/ft) = (Hole Dia2 – Pipe OD2) ÷ 1029.4
8.   Steel Displacement (Pipe) (Bbl/ft) = (Pipe OD2 – Pipe ID2) ÷ 1029.4
9.   Mud Gradient (MG) (Psi/ft) = MW (ppg) x 0.052
10.  Mud Weight (ppg) = MG  ÷ 0.052
11.  Bottom Hole Pressure = HP + Surf Pressure
12.  Pressure at Depth = HP @ Depth + Surface Pressure
13.  Maximum Allowable Surface/Casing Pressure (MASP) = (LOP MW – OMW) x Csg Shoe TVD x 0.052
14.  Equivalent Circulating Density (ECD) =  [APL ÷ (TVD  x 0.052)] + OMW
15.  New Pump Pressure With New Mud Weight: P2 = P1 x (MW2 ÷ MW1)
16.  New Pump Pressure With New Pump Strokes: P2 = P1 x (SPM2 ÷ SPM1)2
17.  Gas Laws (Boyles) =    P1V1 = P2V2                        P2 = (P1 x V1 ) ÷ V2      V2 =  (P1 x V1)  ÷ P2
18.  Influx Length = Kick Size (bbl)           ÷ Annular Volume
19.  Influx (TVD) Height = Influx length x Cosine of Well Inclination Angle
20.  Influx Gradient (Psi/ft) =  MG – [(SICP – SIDPP)  ÷ Influx Height]
21.  Pump Output (PO) (Bbl/min) =  PO (Bbl/Stk) x SPM
22.  POF (triplex pump) = Liner Size2  x Stk length x  .000243
23.  Annular Velocity =  PO ÷ Annular Volume
24.  ICP = SPP + SIDPP
25.  FCP = SPP x KWM ÷ OMW
26.  KWM = (SIDPP  ÷ TVD ÷ 0.052) + OMW
27.  SICP = [(MG – Influx Gradient) x Influx TVD Height] + SIDPP
28.  Trip Margin (ppg) =  [TM (psi) ÷ (TVD x 0.052)] + OMW
29.  Barite To Weight Up Mud (lbs/bbl) = (KWM – OMW) x 1500 ÷ (35.8 - KWM)
30.  Migration / Percolation Rate = Increase in SIDPP (Psi/hr) ÷ (MW x 0.052)
31.  Psi Drop Tripping Dry Pipe (Psi/ft) = (OMW x 0.052 x Steel Displ) ÷ (Csg Cap – Steel Displ)
32.  Psi Drop Tripping Wet Pipe (Psi/ft) = [OMW x 0.052 x (Steel Displ + Pipe Cap)] ÷ Annular Cap
33.  Fluid Level Drop Pulling ALL Drill Collars = (Length DC x Steel Displ) ÷ Csg Cap
34.  Pipe To Pull Before Well Starts To Flow = 
[Over Balance Psi x (Csg Cap – Steel Displ)] ÷ (OMW x 0.052 x Steel Displ)
35.  Volume Of Mud To Bleed To Maintain BHP =
(Increase in Psi x Org Kick Vol (bbls)) ÷ (FP – Increase in Psi)

36.  Pit Gain (Bbl) from Slug Falling = Slug Volume (Bbl) x (Slug Wt – MW) ÷ MW
37.  Buoyancy Factor = (65.5 – MW) ÷ 65.5
38.  Mud volume to bleed for a 100Psi SICP increase (Stair step) = (100 x Annular Cap) ÷ (0.052 x MW)
39.  Mud volume to pump for a 100Psi SICP decrease (Lub & Bleed) = (100 x Annular Cap) ÷ (0.052 x MW)
40.  Pump Rate to Overcome Gas Migration Rate (Stk/min) =  0.1619 x ID2  ÷ PO  bullheading down tubing, DP or OH only                                                                                         or
                                                                                                 GMR/hr x Annular Cap = bbls/hr
                                                                                                bbls/hr ÷ 60 = bbls/min
      bbls/min ÷ PO = Stk/min min to overcome GMR

List of Well Control Acronyms

Pressure = Psi
Pressure Gradient = PG
Formation pressure = FP
Hydrostatic Pressure = HP
Mud Weight = MW
Original Mud Weight = OMW
Kill Weight Mud = KWM
Mud Gradient = MG
Bottom Hole Pressure = BHP
Maximum Allowable Surface / Casing Pressure = MASP
Leak Off Pressure = LOP
Equivalent Mud Weight = EMW
Equivalent Circulating Mud Density = ECD
Annular Pressure Loss = APL
Pump Output (bbls/Stk) = PO
Pump Output Factor (Triplex Pump) = POF
Pump Speed (Stk/min) = SPM
Slow Circulating Rate = SCR
Slow Pump Pressure = SPP
Initial Circulating Pressure = ICP
Final Circulating Pressure = FCP
Drill Pipe Pressure = DPP
Shut In Drill Pipe Pressure = SIDPP
Casing Pressure = CP
Shut In Casing Pressure = SICP
Trip Margin = TM
Gas Migration Rate = GRM

WELL SERVICING METHOD APPLICATIONS



Light Rig Applications
Light rigs are used when there is no drilling unit left on location or when concurrent operations are necessary alongside another unit as they are lower cost, modular built for ease of transporting and relatively easily installed and integrated with existing site infrastructure. Light rigs often include the modern HWO units designed for heavy duty work such as running or pulling large tubulars and conducting milling and drilling operations.
Their application is for workover operations where the well is first killed and made safe by live well intervention methods and then the Xmas tree removed and replaced by workover BOPs.
Light rigs are used mainly for operations which cannot be conducted by other well intervention methods:
·         New drills.
·         Completing.
·         Completing recovery for sidetracking or abandonment.
·         Re-completing
·         Cement repairs to prevent crossflow or close channelling to other weaker formations.
·         Fishing to clear out the wellbore from lost or stuck tools or tubulars.
·         Side-track drilling to new subsurface location.