USEFUL WELL CONTROL FORMULAS (Drilling)
1.   Pressure Gradient (PG) (Psi/ft) = MW (ppg) x 0.052
2.   Mud Weight (MW) = PG  ÷ 0.052
3.   Hydrostatic Pressure (HP) = TVD x MW (ppg) x 0.052
4.   Equivalent Mud Weight (EMW) (ppg) = Psi ÷ TVD ÷ 0.052
5.   Pipe Capacity (Bbl/ft) = Pipe ID2 ÷ 1029.4
6.   Hole Capacity (Bbl/ft) = Hole Dia2 ÷ 1029.4
7.   Annular Capacity (Bbl/ft) = (Hole Dia2 – Pipe OD2) ÷ 1029.4
8.   Steel Displacement (Pipe) (Bbl/ft) = (Pipe OD2 – Pipe ID2) ÷ 1029.4
9.   Mud Gradient (MG) (Psi/ft) = MW (ppg) x 0.052
10.  Mud Weight (ppg) = MG  ÷ 0.052
11.  Bottom Hole Pressure = HP + Surf Pressure
12.  Pressure at Depth = HP @ Depth + Surface Pressure
13.  Maximum Allowable Surface/Casing Pressure (MASP) = (LOP MW – OMW) x Csg Shoe TVD x 0.052
14.  Equivalent Circulating Density (ECD) =  [APL ÷ (TVD  x 0.052)] + OMW
15.  New Pump Pressure With New Mud Weight: P2 = P1 x (MW2 ÷ MW1)
16.  New Pump Pressure With New Pump Strokes: P2 = P1 x (SPM2 ÷ SPM1)2
17.  Gas Laws (Boyles) =    P1V1 = P2V2                        P2 = (P1 x V1 ) ÷ V2      V2 =  (P1 x V1)  ÷ P2
18.  Influx Length = Kick Size (bbl)           ÷ Annular Volume
19.  Influx (TVD) Height = Influx length x Cosine of Well Inclination Angle
20.  Influx Gradient (Psi/ft) =  MG – [(SICP – SIDPP)  ÷ Influx Height]
21.  Pump Output (PO) (Bbl/min) =  PO (Bbl/Stk) x SPM
22.  POF (triplex pump) = Liner Size2  x Stk length x  .000243
23.  Annular Velocity =  PO ÷ Annular Volume
24.  ICP = SPP + SIDPP
25.  FCP = SPP x KWM ÷ OMW
26.  KWM = (SIDPP  ÷ TVD ÷ 0.052) + OMW
27.  SICP = [(MG – Influx Gradient) x Influx TVD Height] + SIDPP
28.  Trip Margin (ppg) =  [TM (psi) ÷ (TVD x 0.052)] + OMW
29.  Barite To Weight Up Mud (lbs/bbl) = (KWM – OMW) x 1500 ÷ (35.8 - KWM)
30.  Migration / Percolation Rate = Increase in SIDPP (Psi/hr) ÷ (MW x 0.052)
31.  Psi Drop Tripping Dry Pipe (Psi/ft) = (OMW x 0.052 x Steel Displ) ÷ (Csg Cap – Steel Displ)
32.  Psi Drop Tripping Wet Pipe (Psi/ft) = [OMW x 0.052 x (Steel Displ + Pipe Cap)] ÷ Annular Cap
33.  Fluid Level Drop Pulling ALL Drill Collars = (Length DC x Steel Displ) ÷ Csg Cap
34.  Pipe To Pull Before Well Starts To Flow = 
[Over Balance Psi x (Csg Cap – Steel Displ)] ÷ (OMW x 0.052 x Steel Displ)
35.  Volume Of Mud To Bleed To Maintain BHP =
(Increase in Psi x Org Kick Vol (bbls)) ÷ (FP – Increase in Psi)

36.  Pit Gain (Bbl) from Slug Falling = Slug Volume (Bbl) x (Slug Wt – MW) ÷ MW
37.  Buoyancy Factor = (65.5 – MW) ÷ 65.5
38.  Mud volume to bleed for a 100Psi SICP increase (Stair step) = (100 x Annular Cap) ÷ (0.052 x MW)
39.  Mud volume to pump for a 100Psi SICP decrease (Lub & Bleed) = (100 x Annular Cap) ÷ (0.052 x MW)
40.  Pump Rate to Overcome Gas Migration Rate (Stk/min) =  0.1619 x ID2  ÷ PO  bullheading down tubing, DP or OH only                                                                                         or
                                                                                                 GMR/hr x Annular Cap = bbls/hr
                                                                                                bbls/hr ÷ 60 = bbls/min
      bbls/min ÷ PO = Stk/min min to overcome GMR

List of Well Control Acronyms

Pressure = Psi
Pressure Gradient = PG
Formation pressure = FP
Hydrostatic Pressure = HP
Mud Weight = MW
Original Mud Weight = OMW
Kill Weight Mud = KWM
Mud Gradient = MG
Bottom Hole Pressure = BHP
Maximum Allowable Surface / Casing Pressure = MASP
Leak Off Pressure = LOP
Equivalent Mud Weight = EMW
Equivalent Circulating Mud Density = ECD
Annular Pressure Loss = APL
Pump Output (bbls/Stk) = PO
Pump Output Factor (Triplex Pump) = POF
Pump Speed (Stk/min) = SPM
Slow Circulating Rate = SCR
Slow Pump Pressure = SPP
Initial Circulating Pressure = ICP
Final Circulating Pressure = FCP
Drill Pipe Pressure = DPP
Shut In Drill Pipe Pressure = SIDPP
Casing Pressure = CP
Shut In Casing Pressure = SICP
Trip Margin = TM
Gas Migration Rate = GRM