Friday, 2 September 2016

WELL SERVICING METHOD APPLICATIONS

WELL SERVICING METHOD APPLICATIONS

Electric wireline can be run in wells with deviation generally less than 70o and sometimes above this limit using specialised tooling. This service is invaluable in obtaining reservoir data to enable production to be optimised. It also has applications in fault finding such as identifying leaks, checking tubular wear, etc. The key with electric wireline is obtaining excellent depth control.
The deviation limit stated above is the limit when gravity is the means of conveying the tool string. Computer programs such as Cerberus can model the ability to access any well but especially for highly deviated wells. Accessing higher angles sections is now possible using tooling such as ‘Roller Bogies’ and horizontal sections can be accessed using recently developed ‘Tractors’. Although more complex than the conventional method the use of tractors is becoming more widespread.
Electric line services are also available for high angle or horizontal wells using coiled tubing to convey the tool string. The electric line is threaded through the coil by pumping. This service is commonly termed ‘stiff wireline’ and is often very useful when pumping operations are also required.
The following table lists the completion and intervention services provided by electric line:
·         Packer setting usually gravel pack sump packers or production packers.
·         Production logging (PLT) to obtain reservoir interval data.
·         Zonal plugging with bridge plugs usually to reduce water production or abandon lower depleted zones.
·         Leak detection in casing or tubing by the use of sonic or temperature instruments.
·         Casing and tubing corrosion monitoring with callipers to ensure tubular integrity.
·         Perforating to increase producing interval.
·         Re-perforating to bypass damaged existing perforations.
·         Casing and tubing repairing with straddles to restore well integrity.
·         Tubing punching to bring on production from additional zones or to enable circulation via the annulus for well killing.
·         Tubing cutting (explosive or chemical) to release tubing from packers and enable recovery by workover.

No comments:

Post a Comment