Friday, 30 September 2016

WELL SERVICING METHOD APPLICATIONS



Light Rig Applications
Light rigs are used when there is no drilling unit left on location or when concurrent operations are necessary alongside another unit as they are lower cost, modular built for ease of transporting and relatively easily installed and integrated with existing site infrastructure. Light rigs often include the modern HWO units designed for heavy duty work such as running or pulling large tubulars and conducting milling and drilling operations.
Their application is for workover operations where the well is first killed and made safe by live well intervention methods and then the Xmas tree removed and replaced by workover BOPs.
Light rigs are used mainly for operations which cannot be conducted by other well intervention methods:
·         New drills.
·         Completing.
·         Completing recovery for sidetracking or abandonment.
·         Re-completing
·         Cement repairs to prevent crossflow or close channelling to other weaker formations.
·         Fishing to clear out the wellbore from lost or stuck tools or tubulars.
·         Side-track drilling to new subsurface location.

No comments:

Post a Comment