Snubbing Applications
Snubbing has had a resurgence in
application in recent years as the operating speeds of modern units and
advantages, in terms of availability, mobility and rig up time, outweighs the
use of workover or light rigs. It has widespread use in the Norwegian sector of
the North Sea for many tasks previously carried out with drilling rigs as the
many rigs have been removed from the platforms for the economic reasons.
The
most commonly used unit for snubbing today is the HWO unit which can be
utilised for both snubbing or workover operations, therefore increasing the
applications and optimising usage for the service providers.
The advantages of using a subbing
unit other those already described above is that it is a live well intervention
method and less likely to cause formation damage. It also has applications in
horizontal wells where the use of coiled tubing is reach limited due to helical
buckling, since the workstring size can be selected for any particular hole
geometry. The big advantage over CT is its’ ability to put weight on bit.
Snubbing has also been used
successfully for sand screen and gravel packing operations.
The downside of snubbing has been
the running speed by using single joints and using hydraulics as the snubbing
power for the jack, however more modern systems are being developed which use
hydraulic motors with a rack and pinion system instead of pistons. This
provides greater running speeds especially useful for ESP installation and
workover. This technology is not new but is an adaption of similar technology
used in the coal mining industry
The following table lists the well
services provided by the snubbing method:
·
Reservoir stimulation to increase
reservoir inflow performance.
·
Cement repairs to prevent crossflow
of zones or close channels to other weaker formations.
·
Drilling (both overbalanced and
underbalanced) to avoid higher drilling unit costs or allow concurrent drilling
operations.
·
Milling to enable sidetracking to
new location or bypass lower section due to technical or geological reasons.
·
Sidetrack drilling to new subsurface
location.
·
Gas lifting to bring wells onstream
by reducing hydrostatic head.
·
Well plugging with conventional
nipple systems or bridge plugs to reduce water production through encroachment
or provide barriers to enable Xmas tree removal or abandon lower depleted
zones.
·
Leak detection by the use of plugs
at various depths.
·
Chemical
scale/paraffin/wax/asphaltine removal to reinstate optimum production rates.
·
Sand removal to obtain optimum
production rates.
·
Perforating to increase or open up
new producing intervals.
·
Casing and tubing repairing with
straddles to maintain well integrity.
.Fishing to clear conduits of lost or stuck
tools/debris.
No comments:
Post a Comment