Saturday, 13 August 2016

Completion String design for an oil well



COMPLETION STRING DESIGN TO INCREASE OIL AND GAS PRODUCTION
(A CASE STUDY OF OREDO 11 OF AN ONSHORE LOCATION OF THE NIGER DELTA)

ABSTRACT
The completion string design was done on Oredo 11 of an onshore location of the Niger Delta. The well was spudded on April 8, 2008 and drilled as a deviated well to a total depth of 16002ft MD. Three reservoirs A-8.1, A-8.2 and B-1.0 were encountered at a depth of 13930” – 14032", 14190" – 14196" and 15759" – 15768" respectively with A-8.1 being two phase reservoir while A-8.2 and B-1.0 being single phase reservoir.
The inflow performance relationship (IPR) for reservoirs A-8.1 was calculated using Vogel correlation equation, and show that its Qmax is 1912.8 BOPD at Pwf (0 psi) while Productivity Index (PI) equation was used for reservoir A-8.2 and B-1.0, and show that Qmax is 2193.3 BOPD at Pwf (0 psi) and Qmax 1749.2 BOPD at Pwf (0 psi) respectively. The Tubing Performance Relationship (TPR) for reservoir A-8.1, A-8.2 and B-1.0 was also calculated using Gilbert Gradient Pressure Curve, the intercept of the TPR and IPR shows the optimum tubing performance for reservoir A-8.1 is 31/2" at Pwf (1100 psi) and Qmax 1680 BOPD, reservoir A-8.2 is 31/2" at Pwf (800 psi) and Qmax 800 BOPD, and reservoir B-1.0 is 23/8" at Pwf (850 psi) and Qmax 1450 BOPD. The choke performance relationship (CPR) was also calculated using F. H. Poetmann and R. L. Beck correlation curve for reservoir A-8.1 its optimum choke size is 32/64" at 1333.36 BOPD flowrate and 1800.09 psi Pwh, while Gilbert Gradient Curve and Gilbert equation for flow through choke was used for both reservoir A-8.2 and B-1.0, and show that the optimum choke size for both A-8.2 and B-1.0 is 32/64" at 1434.84 BOPD flowrate and 1000 psi Pwh for reservoir A-8.2, and 1234.69 BOPD flowrate and 958.41 psi Pwh for reservoir B-1.0.
For optimum production of Oredo 11, the completion string design indicated that, 31/2" tubing size and 32/64" choke size should be used for the short string for maximum production of 1650.07 MMSTB/D while 23/8" tubing size and 32/64" choke size for the long string for maximum production of 1666.82 MMSTB/D.

No comments:

Post a Comment